| Proposed
Concepts |
| Evaluation
Criterion |
MP 139 Concept |
MP 143 Concept A |
Port of Albany Concept A |
Port of Albany Concept
C |
| PROPOSED
ACTION |
| Description |
A new tandem lot would be located
3.1 miles south of Interchange 23 and provide up to
11.0 acres of space. A new diamond interchange
would provide access to the tandem lot. |
A new tandem lot would be located
1.3 miles north of Interchange 23 and provide up to
8.8 acres of space. A new diamond interchange would
provide access to the tandem lot. |
A new tandem lot would be located 1.1 miles east of Interchange 23 in the Port of Albany. The tandem lot would provide up to 14.8 acres of space. New ramps to and from I-787 would provide access to the tandem lot. |
A new tandem lot would be located 1.1 miles east of Interchange 23 in the Port of Albany. The tandem lot would provide up to 14.8 acres of space. Access would be provided through the existing ramps between Church Street and I-787. |
| PROJECT GOALS &
OBJECTIVES |
| Meet the Traffic Capacity
and Safety Needs of the Thruway
system |
| Safety |
This comment applies to the MP 139
Concept and MP 143 Concept A:
No issues identified.
|
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
Potential concern with trucks climbing the steep grade from the Port of Albany to the Thruway. |
| Improve Regional
Mobility |
| Thruway
Facilities |
|
Improvements
|
This comments applies to the MP 139 Concept, MP 143 Concept A, Port of Albany Concept A and Port of Albany Concept C:
Eliminates left-turns in and out of Interchange 23 and Interchange 24 tandem lot.
|
| Concerns |
This comments applies to the MP 139 Concept, MP 143 Concept A, Port of Albany Concept A and Port of Albany Concept C:
None identified.
|
| Non-Thruway
Facilities |
|
Improvements
|
This comment applies to the MP 139
Concept and MP 143 Concept A:
Reduces congestion on I-787 at Interchange 23
and I-90 at Interchange 24 by eliminating
left-turns in and out of the Interchange 23 and
Interchange 24 tandem lots.
|
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
Reduces congestion on I-787 at Interchange 23 and I-90 at Interchange 24 by eliminating left-turns in and out of the Interchange 23 and Interchange 24 tandem lots.
Placing a tandem lot in the Port of Albany would encourage intermodal transport by placing the tandem lot closer to ships on the Hudson River and the trains using the rail line operated by CSX.
|
| Concerns |
This comment applies to the MP 139 Concept, MP 143 Concept A, Port of Albany Concept A and Port of Albany Concept C:
Travel distance for some tandems and/or single unit vehicles would increase.
|
| Minimize Acquisition of
Developed Properties |
| Right-of-Way Required |
Requires:
4± Acres
|
Minimizes right-of-way required. Requires:
0± Acres
|
Requires:
20± Acres |
Requires:
17± Acres |
| No. of Full Acquisitions Required
(approximate) |
| Residential |
0
|
0
|
0 |
0
|
| Commercial |
0
|
0
|
0 |
0
|
| Undeveloped |
1
|
0
|
0 |
0
|
| Minimize Negative
Socio-Economic and Environmental
Concerns |
| Potential Wetland Concerns |
Small pockets of State and Federal
Wetlands are located on the western side of the
Thruway in close proximity to the project
site. |
Small pockets of wetlands not
included on State and Federal Wetland mapping.
Small areas of concern may exist at the eastern end
of project site. |
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
None identified. |
| Potential Noise Benefits |
Removes a noise generator from the
Interchange 23 area. |
Removes a noise generator from the
Interchange 24 area. |
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
Relocates the tandem lot adjacent to other commercial properties in the Port of Albany. |
| Potential Noise Concerns |
Noise concerns are not
anticipated. |
Potential noise concerns at private
school and residential properties north of the
Thruway. |
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
Potential noise concerns at nearby residential properties on both sides of I-787. |
| Potential Air Quality Concerns |
This comment applies to the MP 139
Concept and MP 143 Concept A:
None identified.
|
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
These concepts would move truck traffic closer to residential properties on McCarty Avenue and Mount Hope Drive and could have potential air quality concerns. |
| Potential Ecological Concerns |
This comments applies to the MP 139 Concept, MP 143 Concept A, Port of Albany Concept A and Port of Albany Concept C:
None identified. |
| Potential Aesthetic & Visual
Concerns |
There are no existing viewer groups
located close to the proposed tandem lot. |
Potential visual concerns to
adjacent residential properties on east side of the
Thruway mainline. There are also potential visual
concerns to the golf course located on the west
side of the Thruway mainline. |
The proposed ramps to/from I-787 to the tandem lot will create a significant change to the existing visual character of the area. |
There are no existing viewer groups located close to the proposed tandem lot. |
|
Acquisition of Businesses, Recreation Areas
And Churches
|
This comment applies to the MP 139
Concept and MP 143 Concept A:
Avoids acquisition of existing businesses,
recreation areas and churches.
|
This comment applies to the Port of Albany Concept A and Port of Albany Concept C:
Requires partial acquisition of commercial properties in the Port of Albany. |
| Utility Concerns |
This comment applies to the MP 139 Concept, MP 143 Concept A, Port of Albany Concept A and Port of Albany Concept C:
No major concerns identified. |
| Minimize
Project Costs |
| Order of Magnitude Construction
Cost |
$10 M
|
$9 M
|
$16 M |
$11 M
|
| OTHER
CONSIDERATIONS |
| Special Construction
Considerations |
This concept requires relocation of
the existing Thruway maintenance and storage
facility located east of the Thruway mainline and
the existing Southbound Rest Area located west of
the Thruway mainline. |
None identified. |
Federal and State legislation is required for the use of tandem trailers on Interstate 787.
This concept is located in an Environmental Justice Area near low-income communities on Mount Hope Drive, McCarty Avenue, and South Pearl Street. |
Federal and State legislation is required for the use of tandem trailers on local roadways and Interstate 787.
This concept is located in an Environmental Justice Area near low-income communities on Mount Hope Drive, McCarty Avenue, and South Pearl Street. |
| Staging |
This comment applies to the MP 139 Concept, MP 143 Concept A, Port of Albany Concept A and Port of Albany Concept C:
The tandem lots could be completed separately from each other and other Thruway improvement projects. |