Evaluation Criterion Concept F Concept G Concept H
PROPOSED ACTION
Description The toll plaza would be split into two plazas located side by side. The Thruway ramps would be reconstructed south of the Thruway mainline and the I-890 ramps reconstructed to form a diamond interchange at Curry Road. The toll plaza would be split into two plazas located side by side. The Thruway WB entrance ramp would be reconstructed and the I-890 ramps reconstructed north of Curry Road to eliminate the existing weave on I-890. The toll plaza would be realigned to remove the existing curve at the eastern end of I-890. The Thruway WB entrance ramp would be reconstructed and the I-890 ramps reconstructed north of Curry Road to eliminate the existing weave on I-890.
PROJECT GOALS & OBJECTIVES
Meet the Traffic Capacity and Safety Needs of the Thruway System
Provides Capacity to Meet Design Year

Traffic Volumes

Yes Yes Yes
Freeway Merge/Diverge Level-of-Service This comment applies to Concepts F, G and H:

All operate at LOS D or better.

Safety These comments apply to Concepts F and G:

Increases weaving distance at toll plaza.

Eliminates weave on I-890 between Curry Road ramps.

Two toll plazas separate opposing traffic movements

Increases weaving distance at toll plaza.

Eliminates weave on I-890 between Curry Road ramps.

Concrete barrier at toll plaza separates opposing traffic movements.

Improve Regional Mobility
Thruway Facilities      
Improvements This comment applies to Concepts F, G and H:

Increased capacity at toll plaza would reduce congestion and delay.

Concerns This comment applies to Concepts F, G and H:

No improvement to design speed on Thruway ramps.

Non-Thruway Facilities      
Improvements This comment applies to Concepts F, G and H:

Maintains direct connection between I-890 and the Interchange 25 toll plaza.

Concerns This comment applies to Concepts F and G:

No concerns identified.

Eliminates ramps between I-890, Carman Road, and the Interchange 25 toll plaza.
Number of Intersections Operating at LOS E or worse
2024 No-Build Conditions

1

1

1

2024 Build Conditions

0

0

0

Minimize Acquisition of Developed Properties
Right-of-Way Required Avoids acquisition of developed properties. Requires:

28 ± Acres

Requires:

23 ± Acres

Requires:

28 ± Acres

No. of Full Acquisitions Req’d (approx.)      
Residential

0

3

3

Commercial

0

1

1

Undeveloped

0

2

3

Minimize Negative Socio-Economic and Environmental Concerns
Potential Wetland Concerns This comment applies to Concepts F, G and H:

Minimizes filling wetland. Results in filling of< 0.5 Acres

Potential Noise Benefits This comment applies to Concepts F, G, and H:

Reduces noise by decreasing congestion at toll plaza.

Potential Noise Concerns Constructs new ramps closer to developed properties on Curry Road and Stanford Drive. Constructs new ramps closer to developed properties on Curry Road, Marra Lane, and Stanford Drive. Constructs new ramps closer to developed properties on Curry Road and Dianne Court.
Potential Ecological Concerns This comment applies to Concepts F, G and H:

No ecological concerns identified.

Potential Aesthetic & Visual Concerns Constructs new ramps closer to developed properties on Curry Road and Stanford Drive. Constructs new ramps closer to developed properties on Curry Road, Marra Lane, and Stanford Drive. Constructs new ramps closer to developed properties on Curry Road and Dianne Court.
Acquisition of Businesses, Recreation Areas,

and Churches

No negative concerns identified. This comment applies to Concepts G and H:

Reconstructed ramps require acquisition of one commercial building on Curry Road.

Tandem Lot Concerns This comment applies to Concepts F, G and H:

Not applicable to Interchange 25.

Utility Concerns This comment applies to Concepts F, G and H:

Reconstruction of the Curry Road ramps would require relocation of overhead electric lines located on private property that cross the existing Curry Road ramps and I-890 mainline.

Maximize Use of Existing Infrastructure
Thruway Facilities Replaces Thruway ramps. Replaces Thruway WB ramps. Thruway ramps remain in use.
Non-Thruway Facilities
  • Replaces I-890 mainline south of Curry Road.
  • Replaces ramps between I-890 WB and Curry Road.
  • Replaces 1000 ft of ramp from Carman Road to the Interchange 25 toll plaza.
These comments apply to Concepts G and H:
  • Replaces I-890 mainline south of Curry Road.
  • Replaces ramps between I-890 and Curry Road.
  • Replaces ramps between I-890, Carman Road, and the Interchange 25 toll plaza.
Minimize Project Costs
Order of Magnitude Construction Cost

$37 M

$37 M

$33 M

       
OTHER CONSIDERATIONS
Maintenance and Operations This comment applies to Concepts F, G and H:

Seven (7) additional toll lanes required compared to existing.

Special Construction Considerations This comment applies to Concepts F, G and H:

No special considerations identified at this time.

Environmental Review Process This comment applies to Concepts F, G and H:

The improvements at Interchange 25 could be completed separately from other Thruway improvement projects.

1. Unknown number of residential properties are under construction on Marra Lane west of Interchange 25.

Interchange 25
Evaluation Criterion Concept J Concept K
PROPOSED ACTION
Description The toll plaza would be split into two plazas located side by side and realigned to remove the existing curve at the eastern end of I-890. The Thruway WB entrance ramp would be reconstructed. A diamond interchange, on I-890 north of Curry Road, would replace the ramps at Curry Road. The toll plaza would be split into two plazas located side by side. The Thruway ramps would be reconstructed south of the Thruway mainline.
       
PROJECT GOALS & OBJECTIVES
Meet the Traffic Capacity and Safety Needs of the Thruway System
Provides Capacity to Meet Design Year

Traffic Volumes

Yes Yes
Freeway Merge/Diverge Level-of-Service This comment applies to Concepts J and K:

All operate at LOS D or better.

Safety Increases weaving distance at toll plaza.

Eliminates weave on I-890 between Curry Road ramps.

Two toll plazas separate opposing traffic movements.

Increases weaving distance at toll plaza.

Two toll plazas separate opposing traffic movements.

Improve Regional Mobility
Thruway Facilities
Improvements This comment applies to Concepts J and K:

Increased capacity at toll plaza would reduce congestion and delay.

Concerns This comment applies to Concepts J and K:

No improvement to design speed on Thruway ramps.

Non-Thruway Facilities
Improvements This comment applies to Concepts J and K:

Maintains direct connection between I-890 and the Interchange 25 toll plaza.

Concerns No concerns identified. No concerns identified.
No. of Intersections Operating at LOS E or worse
2024 No-Build Conditions  

1

 

1

2024 Build Conditions  

0

 

0

Minimize Acquisition of Developed Properties
Right-of-Way Required Minimizes right-of-way required. Requires: 

21 ± Acres

Avoids acquisition of developed properties. Requires: 

25 ± Acres

No. of Full Acquisitions Req'd (approx.)      
Residential  

3+1

 

0

Commercial  

2

 

0

Undeveloped  

0

 

0

Minimize Negative Socio-Economic and Environmental Concernss
Potential Wetland Concerns This comment applies to Concepts J and K:

Minimizes filling wetland. Results in filling of< 0.5 Acres

Potential Noise Benefits This comment applies to Concepts J and K:

Reduces noise by decreasing congestion at toll plaza.

Potential Noise Concerns Constructs new ramps closer to developed properties on Curry Road, Dianne Court, and Marra Lane. Constructs new ramps closer to developed properties on Curry Road and Stanford Drive.
Potential Ecological Concerns This comment applies to Concepts J and K:

No ecological concerns identified.

Potential Aesthetic & Visual Concerns Constructs new ramps closer to developed properties on Curry Road, Dianne Court, and Marra Lane. Constructs new ramps closer to developed properties on Curry Road and Stanford Drive.
Acquisition of Businesses, Recreation Areas,

and Churches

New access road requires acquisition of two commercial buildings on Curry Road. No negative concerns identified.
Tandem Lot Concerns This comment applies to Concepts J and K:

Not applicable to Interchange 25.

Utility Concerns Reconstruction of the Curry Road ramps would require relocation of overhead electric lines located on private property that cross the existing Curry Road ramps and I-890 mainline. No major concerns identified.
Maximize Use of Existing Infrastructure
Thruway Facilities Replaces Thruway WB entrance ramp. Replaces Thruway ramps.
Non-Thruway Facilities
  • Replaces I-890 mainline south of Curry Road.
  • Replaces ramps between I-890 and Curry Road.
  • Replaces ramps between I-890, Carman Road, and the Interchange 25 toll plaza.
  • Replaces 1600 ft of ramp from Carman Road to Interchange 25 toll plaza.
Minimize Project Costs
Order of Magnitude Construction Cost  

$36 M

 

$25 M

OTHER CONSIDERATIONS
Maintenance and Operations This comment applies to Concepts J and K:

Seven (7) additional toll lanes required compared to existing.

Special Construction Considerations This comment applies to Concepts J and K:

No special considerations identified at this time.

Environmental Review Process This comment applies to Concepts J and K:

The improvements at Interchange 25 could be completed separately from other Thruway improvement projects.

1. Unknown number of residential properties are under construction on Marra Lane west of Interchange 25.