Interchange 25 |
|
Evaluation Criterion |
Concept F |
Concept G |
Concept H |
|
PROPOSED ACTION |
|
Description |
The toll plaza would be split into two plazas
located side by side. The Thruway ramps would be reconstructed
south of the Thruway mainline and the I-890 ramps
reconstructed to form a diamond interchange at Curry Road. |
The toll plaza would be split into two plazas
located side by side. The Thruway WB entrance ramp would be
reconstructed and the I-890 ramps reconstructed north of Curry
Road to eliminate the existing weave on I-890. |
The toll plaza would be realigned to remove the
existing curve at the eastern end of I-890. The Thruway WB
entrance ramp would be reconstructed and the I-890 ramps
reconstructed north of Curry Road to eliminate the existing
weave on I-890. |
|
PROJECT GOALS & OBJECTIVES |
|
Meet the Traffic Capacity and Safety Needs
of the Thruway System |
|
Provides Capacity to Meet Design Year Traffic
Volumes |
Yes |
Yes |
Yes |
|
Freeway Merge/Diverge Level-of-Service |
This comment applies to Concepts F, G and H:
All operate at LOS D or better. |
|
Safety |
These comments apply to Concepts F and G:
Increases weaving distance at toll plaza.
Eliminates weave on I-890 between Curry Road ramps.
Two toll plazas separate opposing traffic movements |
Increases weaving distance at toll plaza.
Eliminates weave on I-890 between Curry Road ramps.
Concrete barrier at toll plaza separates opposing traffic
movements. |
|
Improve Regional Mobility |
|
Thruway Facilities |
|
|
|
|
Improvements |
This comment applies to Concepts F, G and H:
Increased capacity at toll plaza would reduce congestion and
delay. |
|
Concerns |
This comment applies to Concepts F, G and H:
No improvement to design speed on Thruway ramps. |
|
Non-Thruway Facilities |
|
|
|
|
Improvements |
This comment applies to Concepts F, G and H:
Maintains direct connection between I-890 and the Interchange
25 toll plaza. |
|
Concerns |
This comment applies to Concepts F and G:
No concerns identified. |
Eliminates ramps between I-890, Carman Road,
and the Interchange 25 toll plaza. |
|
Number of Intersections Operating at LOS E or
worse |
|
2024 No-Build Conditions |
1 |
1 |
1 |
|
2024 Build Conditions |
0 |
0 |
0 |
|
Minimize Acquisition of Developed Properties |
|
Right-of-Way Required |
Avoids acquisition of developed properties.
Requires: 28 ± Acres |
Requires: 23 ± Acres |
Requires: 28 ± Acres |
|
No. of Full Acquisitions Reqd (approx.) |
|
|
|
|
Residential |
0 |
3 |
3 |
|
Commercial |
0 |
1 |
1 |
|
Undeveloped |
0 |
2 |
3 |
|
Minimize Negative Socio-Economic and
Environmental Concerns |
|
Potential Wetland Concerns |
This comment applies to Concepts F, G and H:
Minimizes filling wetland. Results in filling of< 0.5
Acres |
|
Potential Noise Benefits |
This comment applies to Concepts F, G, and
H: Reduces noise by decreasing congestion at toll plaza. |
|
Potential Noise Concerns |
Constructs new ramps closer to developed
properties on Curry Road and Stanford Drive. |
Constructs new ramps closer to developed
properties on Curry Road, Marra Lane, and Stanford Drive. |
Constructs new ramps closer to developed
properties on Curry Road and Dianne Court. |
|
Potential Ecological Concerns |
This comment applies to Concepts F, G and H:
No ecological concerns identified. |
|
Potential Aesthetic & Visual Concerns |
Constructs new ramps closer to developed
properties on Curry Road and Stanford Drive. |
Constructs new ramps closer to developed
properties on Curry Road, Marra Lane, and Stanford Drive. |
Constructs new ramps closer to developed
properties on Curry Road and Dianne Court. |
|
Acquisition of Businesses, Recreation Areas,
and Churches |
No negative concerns identified. |
This comment applies to Concepts G and H:
Reconstructed ramps require acquisition of one commercial
building on Curry Road. |
|
Tandem Lot Concerns |
This comment applies to Concepts F, G and H:
Not applicable to Interchange 25. |
|
Utility Concerns |
This comment applies to Concepts F, G and H:
Reconstruction of the Curry Road ramps would require
relocation of overhead electric lines located on private
property that cross the existing Curry Road ramps and I-890
mainline. |
|
Maximize Use of Existing Infrastructure |
|
Thruway Facilities |
Replaces Thruway ramps. |
Replaces Thruway WB ramps. |
Thruway ramps remain in use. |
|
Non-Thruway Facilities |
- Replaces I-890 mainline south of Curry Road.
- Replaces ramps between I-890 WB and Curry Road.
- Replaces 1000 ft of ramp from Carman Road to the
Interchange 25 toll plaza.
|
These comments apply to Concepts G and H:
- Replaces I-890 mainline south of Curry Road.
- Replaces ramps between I-890 and Curry Road.
- Replaces ramps between I-890, Carman Road, and the
Interchange 25 toll plaza.
|
|
Minimize Project Costs |
|
Order of Magnitude Construction Cost |
$37 M |
$37 M |
$33 M |
| |
|
|
|
| OTHER CONSIDERATIONS |
|
Maintenance and Operations |
This comment applies to Concepts F, G and H:
Seven (7) additional toll lanes required compared to existing. |
|
Special Construction Considerations |
This comment applies to Concepts F, G and H:
No special considerations identified at this time. |
|
Environmental Review Process |
This comment applies to Concepts F, G and H:
The improvements at Interchange 25 could be completed
separately from other Thruway improvement projects. |
1. Unknown number of residential properties are under construction on Marra Lane west of Interchange 25.
| Interchange 25
|
| Evaluation Criterion
|
Concept J
|
Concept K
|
| PROPOSED ACTION |
| Description |
The toll plaza would be split into two plazas located side by
side and realigned to remove the existing curve at the eastern
end of I-890. The Thruway WB entrance ramp would be reconstructed.
A diamond interchange, on I-890 north of Curry Road, would replace
the ramps at Curry Road. |
The
toll plaza would be split into two plazas located side by side.
The Thruway ramps would be reconstructed south of the Thruway
mainline. |
| |
|
|
|
| PROJECT GOALS & OBJECTIVES |
|
Meet the Traffic Capacity and Safety Needs of the Thruway System |
| Provides
Capacity to Meet Design Year
Traffic Volumes
|
Yes |
Yes |
| Freeway
Merge/Diverge Level-of-Service |
This comment applies to Concepts J and K:
All operate at LOS D or better.
|
| Safety |
Increases weaving distance at toll plaza.
Eliminates weave on I-890 between Curry Road ramps.
Two toll plazas separate opposing traffic movements.
|
Increases
weaving distance at toll plaza.
Two toll plazas separate opposing traffic movements.
|
|
Improve Regional Mobility |
|
Thruway Facilities |
| Improvements |
This comment applies to Concepts J and K:
Increased capacity at toll plaza would reduce congestion
and delay.
|
| Concerns |
This comment applies to Concepts J and K:
No improvement to design speed on Thruway ramps.
|
|
Non-Thruway Facilities |
| Improvements |
This comment applies to Concepts J and K:
Maintains direct connection between I-890 and the
Interchange 25 toll plaza.
|
| Concerns |
No concerns identified. |
No
concerns identified. |
| No.
of Intersections Operating at LOS E or worse |
| 2024
No-Build Conditions |
1
|
1
|
| 2024
Build Conditions |
0
|
0
|
|
Minimize Acquisition of Developed Properties |
| Right-of-Way
Required |
Minimizes right-of-way required. Requires:
21 ± Acres
|
Avoids
acquisition of developed properties. Requires:
25 ± Acres
|
| No.
of Full Acquisitions Req'd (approx.) |
|
|
|
| Residential |
3+1
|
0
|
| Commercial |
2
|
0
|
| Undeveloped |
0
|
0
|
|
Minimize Negative Socio-Economic and Environmental Concernss |
| Potential
Wetland Concerns |
This comment applies to Concepts J and K:
Minimizes filling wetland. Results in filling of< 0.5 Acres
|
| Potential
Noise Benefits |
This comment applies to Concepts J and K:
Reduces noise by decreasing congestion at toll
plaza.
|
| Potential
Noise Concerns |
Constructs new ramps closer to developed properties on Curry Road,
Dianne Court, and Marra Lane. |
Constructs
new ramps closer to developed properties on Curry Road and Stanford
Drive. |
| Potential
Ecological Concerns |
This comment applies to Concepts J and K:
No ecological concerns identified.
|
| Potential
Aesthetic & Visual Concerns |
Constructs new ramps closer to developed properties on Curry Road,
Dianne Court, and Marra Lane. |
Constructs
new ramps closer to developed properties on Curry Road and Stanford
Drive. |
| Acquisition
of Businesses, Recreation Areas,
and Churches
|
New access road requires acquisition of two commercial buildings
on Curry Road. |
No
negative concerns identified. |
| Tandem
Lot Concerns |
This comment applies to Concepts J and K:
Not applicable to Interchange 25.
|
| Utility
Concerns |
Reconstruction of the Curry Road ramps would require relocation
of overhead electric lines located on private property that cross
the existing Curry Road ramps and I-890 mainline. |
No
major concerns identified. |
|
Maximize Use of Existing Infrastructure |
| Thruway
Facilities |
Replaces Thruway WB entrance ramp. |
Replaces
Thruway ramps. |
| Non-Thruway
Facilities |
- Replaces I-890 mainline south of Curry Road.
- Replaces ramps between I-890 and Curry Road.
- Replaces ramps between I-890, Carman Road, and the Interchange
25 toll plaza.
|
- Replaces 1600 ft of ramp from Carman Road to Interchange 25
toll plaza.
|
|
Minimize Project Costs |
| Order
of Magnitude Construction Cost |
$36 M
|
$25 M
|
| OTHER CONSIDERATIONS |
| Maintenance
and Operations |
This comment applies to Concepts J and K:
Seven (7) additional toll lanes required compared
to existing.
|
| Special
Construction Considerations |
This comment applies to Concepts J and K:
No special considerations identified at this time.
|
| Environmental
Review Process |
This comment applies to Concepts J and K:
The improvements at Interchange 25 could be completed
separately from other Thruway improvement projects.
|
1. Unknown number of residential properties are under construction on Marra Lane west of Interchange 25.