About the Project
The New York State Thruway
Authority is evaluating the operating and capacity concerns at the Williamsville
Toll Barrier, located between interchange 49 and 50 (see map) on the New
York State Thruway I-90 in the Town of Amherst. The evaluation will include
engineering studies, environmental Studies and a broad public outreach
program. The following will be evaluated:
- The ability of the existing Toll Barrier to handle
present and future traffic, maintain public and worker safety, and
incorporate technology advances. This evaluation will consider the
facility in its current configuration as well as investigate improvements
that could be made to the toll barrier to meet these objectives.
- The need to retain the Toll Plaza facility currently
located at Interchange 49, Transit Road.
- Other possible toll barrier locations, between
Interchange 49, Transit Road, and Interchange 48A, Pembroke. There
are three leading candidate sites for relocation of the barrier, which
are identified with red arrows on the map.
These sites are:
- Milepost 410, Towns of Clarence, Lancaster and Newstead;
- Milepost 408-409, Town of Newstead;
- Milepost 404-405, Towns of Newstead and Pembroke.
- A comparison between the toll barrier at its
present location and other possible locations. This comparison will
focus on objectives related to customer service, operational issues,
as well as social, economic and environmental issues.
- Various plaza configurations that incorporate
newer technologies and maximize customer convenience, including highway
speed E-ZPass.
This evaluation will result in a recommended solution
for the capacity and operating concerns at the Williamsville Toll Barrier
and Transit Road Interchange that best satisfies all needs and that carefully
considers public input.
Public input on all aspects of the project is welcome and encouraged.
All interested parties are encouraged to express their views concerning the economic and social effects of the project, the project's impact on the environment, and the project's consistency with the goals and objectives of such planning.
Get
Adobe Reader
If you experience a problem viewing a PDF document, please
read this.
|