Projects & Studies

View Scheduled Construction Lane Closures

To ensure that the needs of the traveling public are met today and into the future, it becomes necessary to rehabilitate, replace or improve certain components of the Thruway’s aging infrastructure. Several studies and projects are carried out each year that result in less traffic congestion, improved and more efficient toll lanes, an overall improved infrastructure and various other customer oriented improvements system-wide.

Various studies involving noise analyses, alternative feasibility, corridor and toll collection improvements, potential environmental impacts, and alternative energy projects help to develop a prioritized Capital Improvement Plan to address the structural, safety, capacity and operational needs of the Thruway. These studies eventually result in design projects to implement the necessary improvements.

Project Design Matrix
Project Design Elements Projects & Studies
Roadway & Interchange Reconstruction BUF, I84, I23, TZB, I39
Pavement Resurfacing, Restoration & Rehabilitation BUF, I39
Safety Upgrades & Improvements I23, I39
Highway Speed E-ZPass WIL, WTB , SV
Noise Wall Construction I23
Rock Slope Stabilization & Removal MP165, MP 212
Bridge Replacement & Rehabilitation TZB, I84
Toll Plaza/Barrier Improvements WIL, I84
Intelligent Transportation System (ITS) Installations BUF
Environmental Compliance All Projects & Studies

LEGEND:
I23 = Thruway Reconstruction Between I23 & I24
I84 = I84-I87 Reconstruction Project
BUF = Buffalo Corridor Study
MP = Milepost
TZB = Tappan Zee Bridge/I287 Env. Review
WIL = Williamsville Toll Barrier Improvement Project
WTB = Woodbury Mobility Improvement Project
SV = Highway Speed E-ZPass at Spring Valley
I39 = Thruway Reconstruction Between I39 & I40